Gold King Mine

More than a year after the toxic waste spill at the Gold King Mine near Silverton, Colorado, the Environmental Protection Agency (EPA) recently named the mine as a Superfund site for remediation. A significant portion of the reclamation of this notorious mine would involve annular filling of portions of the mine for future operations.
ClientEPA
LocationSilverton, CO
ServicesLightweight Cellular Concrete

Project Details

The project specification required a material density of 500 psi. Local contractor Condeck chose to use Aerix Industries AERLITE-iX™ non-pervious cellular lightweight concrete (CLWC) as the annular fill products of the mine. The mine presented a unique challenge because of its remote location, requiring all of the equipment to be transported up steep, one-mile inclines.
  
The use of Aerix’s AERLITE-iX™ provided the density needed to stabilize this remediated mine, and offered the speedy installation that the EPA required to transform the Gold King Mine into a functional mine once again.